2016
LA 39 Crossdrain Repair at DeBouchel Canal
Storm Drain Repair & Replacement
La DOTD
2015/2016
Glisson Park Boat Launch
Boat Dock Demolition and Replacement
Jefferson Parish
2015
Industrial Blvd to Thompson Rd. – PH 2 LA DOTD
Storm Drainage Installation
Sub for Barriere
2013 / 2014
Industrial Blvd to Thompson Rd. – PH 1 LA DOTD
Storm Drainage Installation
Sub for Barriere
2012 /(Active)
SELA 15 – Trapp Canal USACE
Install Sheet Piling, Rip Rap, Crushed Stone
Sub for Hamp’s Construction
2012 /2013
Algiers Seepage Control USACE
Steel Sheet Pile Installation, Embankment
Sub for Blackhawk Ventures
2012 /2013
O.H. Ivie Reservoir Intake
Colorado River/Municipal Water Dist.
Intake Channel Dredging
2011 / 2012
East Houma Surge Levee
Terrebonne Levee and Conservation District
Drainage Structures and Levee Embankment
2011 /2011
US 190 Lateral Drainage LA DOTD
Drainage Improvements
2011 /2011
Lake Chapeau Hydrologic Restoration
State of LA –Coastal Protection & Restoration
Structure Demolition
Calendar
M | T | W | T | F | S | S |
---|---|---|---|---|---|---|
« May | ||||||
1 | 2 | 3 | 4 | 5 | 6 | |
7 | 8 | 9 | 10 | 11 | 12 | 13 |
14 | 15 | 16 | 17 | 18 | 19 | 20 |
21 | 22 | 23 | 24 | 25 | 26 | 27 |
28 | 29 | 30 | 31 |